Part B fire safety, Part K stairs & Engineer compliance in Ireland

Turning a two-storey Irish home into a legal three-storey bedroom house requires TGD Part B third-storey fire upgrades (protected stairwell, FD30S fire doors, LD1 alarms and 0.33 m² escape window), 2.0m Part K stairs clearance, 0.16 W/m²K insulation and an Engineer Opinion on Compliance.

Check every structural, fire and stairs threshold before signing a contractor contract.

Free, no obligation. One local specialist covering your area replies, not five.

  • €32,000 to €44,000rear flat-roof box dormer on a gabled house (turnkey incl. 13.5% VAT)
  • €40,000 to €55,000hip-to-gable + rear box dormer on a 3-bed or 4-bed hipped semi-D
  • €48,000 to €68,000+detached, mansard, L-shaped or standing-seam zinc architectural dormer
  • 12 wks + 4–6 wksstatutory council planning cycle followed by 4 to 6 weeks build on site

Irish Building Regulations checklist for habitable third-storey dormers

Technical Guidance DocumentMandatory Irish RequirementHow a compliant dormer contractor builds it
TGD Part A (Structure)Independent floor load path & roof stabilityCertified 152×89 / 203×102 UB steel beams on masonry padstones + C24 floor joists & collar/rafter ties
TGD Part B (Fire Safety)30-min protected stairwell, FD30S doors, LD1 & escape windowFD30S fire doors with intumescent/cold-smoke seals on all habitable rooms off stairs, LD1 interlinked alarms & ≥0.33 m² window
TGD Part F (Ventilation)Background trickle vents + wet-room extractTrickle vents (≥7,000 mm²) on dormer frames + 15–30 L/s ducted mechanical fan through roof slate vent
TGD Part K (Stairways)2.0m clear headroom & max 42° pitchFull-flight or winder timber staircase positioned under hip-to-gable or dormer ceiling with 900mm handrail
TGD Part L (Energy / U-Values)0.16 W/m²K roof · 0.18 W/m²K cheeks120–150mm foil-faced PIR warm roof + insulated plasterboard + 50mm ventilated pitched rafter airway

Why "storage room" shortcuts cost €30,000–€60,000 at house sale time

Some budget attic outfits offer to skip fire doors, squeeze in steep space-saver paddle stairs with 1.75m headroom, or leave out structural steel calculations by labelling the quote an "attic storage room". Under Law Society of Ireland conveyancing requisitions and Irish bank valuation rules, an uncertified loft cannot be marketed or valued as a bedroom. Worse, if a dormer was built externally without planning permission or Part B fire protection, a buyer's solicitor will hold up the sale until retention and remedial fire-door works are completed.

Open-plan ground floors and Part B third-storey fire escape

In a converted two-storey house (now three storeys), your stairwell is your family's protected 30-minute escape tunnel from the top floor to the front door. If a previous renovation knocked your ground-floor hallway open into the kitchen or living room, TGD Part B requires either reinstating a 30-minute fire-resisting glazed/stud screen and FD30S door at the foot of the stairs, or installing an engineered domestic residential mist-suppression system signed off under a Fire Safety / DAC assessment.

Get an itemised dormer attic quote for your house

Select your dormer style, planning stage and county. Your enquiry goes to one experienced dormer attic specialist covering your county, who measures ridge height and stairs clearance on site and quotes in writing.

Which dormer conversion are you pricing?

Pick the closest match to your house and roof.

Dormer attic 2026 cost guides, council planning & fire regs

Straight answers to what homeowners ask most: itemised 2026 costs, material specifications, drainage & planning rules, and what to check before you book.

2026 Turnkey CostsDormer attic conversion cost in Ireland (2026 price guide)Itemised 2026 Irish dormer prices incl. 13.5% VAT: rear box dormers €32,000–€44,000, hip-to-gable + rear dormer €40,000–€55,000, zinc/detached dormers €48,000–€68,000+, vs Velux €19,500–€28,500.Read the guide →Hipped Semi-D SolutionHip-to-gable & rear dormer conversions for 3-bed & 4-bed semisHow Irish 3-bed and 4-bed hipped-roof semi-detached houses gain 22–28 m² of full 2.4m headroom and Part K stairs clearance (€40,000–€55,000 incl. VAT).Read the guide →Box, Zinc & MansardRear box dormers, L-shaped period dormers & zinc claddingWarm-deck GRP fibreglass and EPDM flat dormer roofs, standing-seam zinc, natural slate and fibre-cement cheeks engineered to 0.16 W/m²K.Read the guide →Council Planning RulesDormer attic planning permission rules in IrelandWhy Irish dormers need full Local Authority planning permission (12-week cycle, €1,800–€3,200 drawings), plus ridge set-down and cheek step-in rules.Read the guide →Building Regs & ResalePart B third-storey fire safety, Part K stairs & Engineer sign-offFD30S fire doors with cold-smoke seals, protected stairwells, LD1 alarms, 2.0m stairs headroom, 0.33 m² escape windows and Opinions on Compliance.Read the guide →Master Suites & En-SuitesDormer attic master bedrooms & en-suite bathroomsAdding a dormer master bedroom with a pumped shower en-suite (+€5,500–€8,500), soil stack tie-in, eaves storage and acoustic floor insulation.Read the guide →Guides & Calculator HubDormer Attic Conversion Ireland guides, calculator & referenceAll Irish dormer attic conversion guides: 2026 rear box and hip-to-gable prices, planning permission rules, Part B fire doors, Part K stairs headroom, en-suites and all 26 counties.Read the guide →Technical ReferenceDormer Attic Conversion Ireland glossary of terms & specificationsPlain-English engineering and planning glossary of 15 Irish dormer attic, structural RSJ, Part B fire safety and Part L insulation terms.Read the guide →

More guides & resources: All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · Editorial standards · Contact · About this site

Fire doors, escape windows & resale compliance questions

What fire safety upgrades (TGD Part B) are legally required for a third-storey dormer bedroom?

Converting an attic above a first floor creates a three-storey house under Irish Technical Guidance Document Part B. To certify the loft as a habitable bedroom rather than non-habitable storage, you must enclose the stairwell down to a final ground-floor exit, upgrade every habitable door off the stairs to FD30S 30-minute fire-resisting doors with intumescent heat strips and cold-smoke seals, fit mains-interlinked LD1 smoke and kitchen heat alarms to IS 3218, and install a compliant escape window (at least 0.33 m² clear opening, minimum 450mm × 450mm).

How long does a dormer attic conversion take on site and can we live in the house?

Once your 12-week planning permission is in place, on-site construction typically takes 4 to 5 weeks for a rear box dormer and 5 to 7 weeks for a hip-to-gable plus rear dormer with an en-suite. During the first 2.5 to 3.5 weeks, structural RSJ steels, floor joists, external dormer framing and weatherproof GRP/EPDM or zinc cladding are completed from outside off scaffolding before the new stairwell opening is cut through into your first-floor landing, so families stay living at home throughout.

Will my dormer conversion count as an extra bedroom when selling or remortgaging?

Yes, provided it has full Planning Permission (where required), meets TGD Part A (structural steels), Part B (third-storey fire doors, protected stairwell and escape window), Part F (ventilation), Part K (2.0m stairs headroom) and Part L (0.16 W/m²K roof insulation), and is signed off with a Chartered Structural Engineer or Architect Opinion on Compliance. Without those, estate agents and bank valuers can only advertise the space as 'attic storage'.

Dormer attic specialists across all 26 counties

Homeowner enquiries across all 26 counties go to one experienced dormer attic specialist covering your county, from Dublin, Cork, Kildare and Meath to Galway, Wicklow, Limerick, Louth and Waterford. Pick your county below for local CSO semi-detached housing figures, council planning notes and 2026 dormer prices. Compare all areas covered →

Checking whether your roof suits a rear dormer or hip-to-gable?

One experienced dormer attic specialist covering your county checks your ridge height, stairs landing headroom and load-bearing walls on site, and provides a clear written quote.