Dormer attic master bedrooms & en-suite shower rooms in Ireland
Because a rear box or hip-to-gable dormer creates a full 2.4m flat ceiling across the back half of your house, most Irish homeowners pair the new bedroom with a tanked pumped en-suite shower room (+€5,500 to €8,500) and fitted wardrobes along the front eaves.
See how cold-water tank relocation, soil stacks and acoustic floor insulation are detailed cleanly.
Free, no obligation. One local specialist covering your area replies, not five.
- €32,000 to €44,000rear flat-roof box dormer on a gabled house (turnkey incl. 13.5% VAT)
- €40,000 to €55,000hip-to-gable + rear box dormer on a 3-bed or 4-bed hipped semi-D
- €48,000 to €68,000+detached, mansard, L-shaped or standing-seam zinc architectural dormer
- 12 wks + 4–6 wksstatutory council planning cycle followed by 4 to 6 weeks build on site
Planning an attic master bedroom & pumped en-suite (+€5,500–€8,500)
| Master Suite Element | 2026 Supply & Fit Guide | Key plumbing, structural & storage detail |
|---|---|---|
| Compact Attic WC & Hand-Basin Cloakroom | €3,400 to €4,800 | Tucked neatly into front sloping eaves with 110mm soil connection & roof-tile vent |
| Full Tanked Attic En-Suite Shower Room | €5,500 to €8,500 | 900×1200mm low-profile tray, tanking membrane, twin-impeller pump/unvented feed, WC, vanity & tiling |
| Bespoke Fitted Front-Eaves Wardrobes & Drawers | €2,200 to €4,200 | Uses the low 0.9m–1.5m front roof slope for deep pull-out drawers & hanging rails |
| Tilt-and-Turn Juliet Balcony Rear Glazing | +€1,800 to €3,400 | 1,100mm toughened laminated glass or powder-coated balustrade (subject to council overlooking check) |
Water pressure, cold-water header tanks & soil stack routing
- Relocating the attic cold-water storage tank: Traditional gravity-fed Irish plumbing places the plastic cold-water cistern right in the middle of the loft. During a dormer build, plumbers either relocate a low-profile insulated coffin tank into the remaining front eaves void on a reinforced bearer platform, or upgrade the house to a mains-pressurised unvented cylinder / combi system to free up space and deliver strong third-storey shower pressure.
- Aligning the 110mm foul soil pipe: Positioning the new attic WC and shower along the same side/rear wall as your existing first-floor bathroom allows a straight 110mm gravity connection into the soil-and-vent stack without noisy macerator pumps.
- Acoustic separation from kids' bedrooms below: Packing 100mm high-density acoustic mineral wool (RW45) between the new independent 200mm floor joists plus resilient floor strips stops footstep thuds travelling into the bedrooms directly underneath.
Calculate your dormer attic cost, floor gain & planning timeline
Pick your existing roof shape, preferred dormer build and whether you want an attic en-suite bathroom. Figures reflect 2026 Irish turnkey build rates including 13.5% VAT.
Estimated 2026 turnkey build range (incl. 13.5% VAT)
€45,500 to €61,000
Hipped-Roof 3/4-Bed Semi-Detached · Hip-to-Gable + Full Rear Box Dormer · + En-Suite
Adds approx. 22–27 m² at full 2.4m headroom including a tanked pumped en-suite shower room (€5,500–€8,500) (incl. 13.5% VAT). Spec: Masonry/timber-slate gable build-up + ridge RSJ + Part K stairs over landing, TGD Part K 2.0m headroom stairs, Part B FD30S fire doors + LD1 alarms, and 0.16 W/m²K Part L insulation. Allow €1,800–€3,200 + 12 weeks for council planning permission, then 4 to 6 weeks on site (vs €19,500–€28,500 for a sloped Velux loft).
How this is worked out: structural RSJ steels, roof build-up, Part K stairs, Part B fire upgrade, plastering, electrics and 13.5% VAT. Estimate only; architectural planning pack (€1,800–€3,200) priced separately.
Send these specs to get a written quoteGet an itemised dormer attic quote for your house
Select your dormer style, planning stage and county. Your enquiry goes to one experienced dormer attic specialist covering your county, who measures ridge height and stairs clearance on site and quotes in writing.
Dormer attic 2026 cost guides, council planning & fire regs
Straight answers to what homeowners ask most: itemised 2026 costs, material specifications, drainage & planning rules, and what to check before you book.
More guides & resources: All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · Editorial standards · Contact · About this site
Attic en-suite plumbing, water tanks & headroom questions
Will an attic shower have weak water pressure on the third floor?
Not when plumbed properly. Because an attic shower head sits near or above the level of a gravity loft cistern, gravity alone will not work. Plumbers fit either a dedicated quiet regenerative brass twin-impeller booster pump in the hot press or connect to a mains-pressurised unvented hot-water cylinder delivering 2.0 to 3.0 bar at the third-floor mixer.
How much clear ceiling height do you get inside a dormer attic bedroom and en-suite?
Provided your existing roof ridge has at least 2.25m to 2.4m clear height before conversion, a rear flat-roof warm-deck dormer typically achieves 2.25m to 2.40m flat ceiling height right out to the rear window wall, giving full standing height for a 2.0m glass shower screen.
How long does a dormer attic conversion take on site and can we live in the house?
Once your 12-week planning permission is in place, on-site construction typically takes 4 to 5 weeks for a rear box dormer and 5 to 7 weeks for a hip-to-gable plus rear dormer with an en-suite. During the first 2.5 to 3.5 weeks, structural RSJ steels, floor joists, external dormer framing and weatherproof GRP/EPDM or zinc cladding are completed from outside off scaffolding before the new stairwell opening is cut through into your first-floor landing, so families stay living at home throughout.
Will my dormer conversion count as an extra bedroom when selling or remortgaging?
Yes, provided it has full Planning Permission (where required), meets TGD Part A (structural steels), Part B (third-storey fire doors, protected stairwell and escape window), Part F (ventilation), Part K (2.0m stairs headroom) and Part L (0.16 W/m²K roof insulation), and is signed off with a Chartered Structural Engineer or Architect Opinion on Compliance. Without those, estate agents and bank valuers can only advertise the space as 'attic storage'.
Dormer attic specialists across all 26 counties
Homeowner enquiries across all 26 counties go to one experienced dormer attic specialist covering your county, from Dublin, Cork, Kildare and Meath to Galway, Wicklow, Limerick, Louth and Waterford. Pick your county below for local CSO semi-detached housing figures, council planning notes and 2026 dormer prices. Compare all areas covered →
Checking whether your roof suits a rear dormer or hip-to-gable?
One experienced dormer attic specialist covering your county checks your ridge height, stairs landing headroom and load-bearing walls on site, and provides a clear written quote.